[问答题]

某水闸共10孔,每孔净宽10.0m。底板厚1.6m,闸室总宽112.8m,顺水流长16.Om;闸室及翼墙底板基础采用水泥土搅拌桩处理。其主要工程内容有:①地基与基础;②闸室段(土建);③上游连接段;④下游连接段;⑤消能防冲段;⑥交通桥(工作桥);⑦金属结构及启闭机安装;⑧启闭机房和桥头堡。施工过程中,发生如下事件:
事件1:水泥土搅拌桩在施工前进行了2根工艺性试验桩,确定了施工参数。
事件2:水泥土搅拌桩施工完成后,施工单位对基坑进行了开挖,按规范要求对水泥土搅拌桩进行了检测。检测合格后,施工单位组织项目法人、监理、设计、质量监督、运行管理等单位组成联合小组,共同检查核定其质量等级并填写签证表。
事件3:水闸闸墩施工正值高温季节,为此,施工单位采取了多项温控措施保证混凝土施工质量。
事件4:本工程共划分为1个单位工程。单位工程完成后,监理单位组织项目法人、设计、施工、运行管理、质量监督等单位组成外观质量评定小组,现场进行工程外观质量检验评定,并将评定结论报工程质量监督机构核备。

事件2中有何不妥之处?并说明理由。

举例说明人格特征与驾驶行为之间的关系。 When executing a SQL workload,you choose to generate execution plans only, without collecting execution statistics.  Which two statements describe the implications of this?() [" It produces less accurate results of the comparison analysis."," It automatically calls the SQL Tuning Advisor for recommendations."," It shortens the time of execution and reduces the impact on system resources."," Only the changes in the execution plan,and not performance regression,are detected."] 变压器空载损耗()。 ["全部为铜损耗","主要为铁损耗","主要为铜损耗","全部为铁损耗"] 【背景资料】某5层砖混结构宿舍楼,7度抗震设防。墙厚240mm,墙长48m,宽12m,实际地质情况为西部地基土为中偏高压缩性土,而东部较坚硬。因紧邻该建筑的东侧建有同类型的房屋,并具有详细的地质勘察资料,故建设方省去了地质勘察,要求设计院按该地质勘察资料确定地基承载力。在房屋报建时因无地质资料,未获审批,后不得不补做了勘察,但此时基础已施工完成。施工方为了赶工期,新招进一劳务作业队伍进行墙体砌筑,发现砌筑砂浆层饱满度为75%,皮数砖同缝,多处转角和纵横墙丁字相交处的施工临时洞口处留直槎等情况,当房屋建至5层,墙面开始出现少量细微裂纹,随后逐步发展为裂缝,且不断增多。 请根据上述背景资料完成以下选项。 蒸压加气混凝土砌块施工时的含水率宜小于20%。 A customer wants to hold all enterprise data on their DS4000 system.  Several servers were added after they purchased another company.  The servers that have to be run are:       (1)An Oracle database running on a HP-UX server   (2)Several virtual machines running on VMWare ESX server       (3)A Microsoft cluster running Exchange 2000 server   Which of these new servers can be integrated with the DS4000?() ["DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.","An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.","When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.","VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used."]

某水闸共10孔,每孔净宽10.0m。底板厚1.6m,闸室总宽112.8m,顺水流长16.Om;闸室及翼墙底板基础采用水泥土搅拌桩处理。其主要工程内容有:①地基与基础;②闸室段(土建);③上游连接段;④下游连接段;⑤消能防冲段;⑥交通桥(工作桥);⑦金属结构及启闭机安装;⑧启闭机房和桥头堡。施工过程中,发生如下事件:
事件1:水泥土搅拌桩在施工前进行了2根工艺性试验桩,确定了施工参数。
事件2:水泥土搅拌桩施工完成后,施工单位对基坑进行了开挖,按规范要求对水泥土搅拌桩进行了检测。检测合格后,施工单位组织项目法人、监理、设计、质量监督、运行管理等单位组成联合小组,共同检查核定其质量等级并填写签证表。
事件3:水闸闸墩施工正值高温季节,为此,施工单位采取了多项温控措施保证混凝土施工质量。
事件4:本工程共划分为1个单位工程。单位工程完成后,监理单位组织项目法人、设计、施工、运行管理、质量监督等单位组成外观质量评定小组,现场进行工程外观质量检验评定,并将评定结论报工程质量监督机构核备。

事件2中有何不妥之处?并说明理由。
参考答案:

  参考解析

本题暂无解析