当前位置:经济学题库>网络经济与企业管理题库

问题:

[问答题] 简述供应链管理环境下能力平衡的作用以及生产控制内容。

Your company has a server named Server1 that runs Windows Server 2008 R2. The Windows Server Backup feature is installed on Server1.Server1 fails. You install a new server named Server2 that runs Windows Server 2008 R2.You need to restore the company¯ Windows SharePoint Services (WSS) site to Server2. What should you do?() [" Use Wbadmin to restore the system state from backup."," Run Wbadmin with the Get Versions option. Install WSS."," Run Wbadmin with the Start Recovery option. Install WSS."," Use Wbadmin to restore the application and the sites from backup."] 你正在定义个一叫做Certkiller的类,这个类包含如下内容. Certkiller类包含一个可以再对象上执行的叫做ProcessChildren的方法。 Cerkiller类的对象可以被序列化() ["Apply the OnDeserializing attribute to the ProcessChildren method.","Specify that Certkiller Class implements the IDeserializationCallback interface.","Specify that Certkiller Class inherits from the ObjectManager class.","Apply the OnSerialized attribute to the ProcessChildren method.","Create a GetObjectData method that calls ProcessChildren.","Create an OnDeserialization method that calls ProcessChildren."] 已知屋架中心高度3.8m,另一端高度2.6m,整个跨度24m,坡度为()。 ["1:20","1:15","1:5","1:10"] 计算机中最重要的核心部件是()。 ["DRAM","CPU","CRT","ROM"] 某工程项目合同约定采用调值公式法进行结算,合同价为50万元,其中可调部分为:人工费占15%,材料费占60%,其他为不可调部分。结算时,人工费价格指数上涨了10%,材料费价格指数上涨了20%,则该项目应结算的工程价款为()万元。 ["56","56.35","57","56.75"] 简述供应链管理环境下能力平衡的作用以及生产控制内容。
参考答案:

  参考解析

本题暂无解析

在线 客服